P

Paulson Drain Number 7

This drain was built in 1905.

Length: 4.5 miles

History: This drain has had several cleanouts performed over the years, the most recent in 1994.

There was a plan made many years ago to join this drain with Mergenthal Drain Number 5 to share an outlet to the Goose River.

The drain works well. There have been no major problems. FEMA work and some cleaning were done in 2002.

A culvert replacement was made with further cleaning in 2004.

American Crystal Sugar moved the south end of the drain to the 1/4 line boundary in 2009.

The outlet culvert was replaced in Section 28. The Board is looking into purchasing right-of-way in Section 28 to the Goose River.

A bridge was replaced at the top of the drain to divide the water between the Paulson 7 drain and the Mickelson Drain Number 13.

  • FEMA cleaned silt in 2009.